Connect with us

Science

Starship is Chosen by Lunar Outpost to Transport the Rover to the Moon

Published

on

For NASA’s possible use, Lunar Outpost has chosen SpaceX’s Starship vehicle to transport the Artemis lunar rover it is developing to the moon.

The Denver-based business revealed on November 21 that it has reached a deal with SpaceX to use Starship to deliver the company’s Lunar Outpost Eagle rover to the moon. Neither the launch date nor any other details of the agreement were disclosed by the companies.

In April, NASA awarded contracts to Lunar Outpost and three other firms for the first phase of the Lunar Terrain Vehicle (LTV) program, which will help construct a rover for future Artemis missions. Each business was given a one-year contract to complete a preliminary design review (PDR) of their rovers. The government will then choose at least one of the companies to continue developing the rover.

Delivering the rover to the moon is the responsibility of the firms under the LTV program, which is set up as a services contract. When NASA no longer needs those rovers, those businesses will be allowed to use them for commercial purposes.

In an interview, Lunar Outpost CEO Justin Cyrus stated that the company chose SpaceX after receiving “great responses” from a number of businesses. He stated, “The reason we chose Starship is their technological maturation, the pace at which they move and the quality of that organization “It’s a vehicle that we think will be able to provide reliable landing on the lunar surface, and we know that they can get it done on the timelines we need.”

Although he did not reveal other vehicles his business investigated alongside Starship, Lunar Outpost developed the rover to be compatible with as many conceivable landing mechanisms as possible. “We need this vehicle to be compatible with multiple different lander providers, so that way we have the optionality, that way we have flexibility, and we can evaluate technical progress over time just to make sure we can derisk our commercial case.”

The team working on the rover is led by Lunar Outpost and consists of Leidos, MDA Space, Goodyear, and General Motors. After Lunar Outpost failed to reach a consensus regarding Lockheed Martin’s involvement in the project, Leidos took over as one of the partners on the “Lunar Dawn” team in September.

NASA astronauts recently drove a rover prototype for human factors testing as part of that team’s busy work to improve the rover’s design. Cyrus stated, “We learned what the astronauts really like and what we can improve upon,” 

In roughly six months, the contract’s first phase will come to an end with a PDR. In order to create the rover and acquire services for the following phase, NASA will then ask Lunar Outpost and the other two grantees, Intuitive Machines and Venturi Astrolab, to submit ideas.

Although Cyrus and other industry professionals are urging NASA to select multiple companies to provide redundancy, as the agency has done in other services programs like the Human Landing System, NASA officials have stated that budget constraints mean they are likely to select only one company for that next phase.

“NASA should pick two. Dissimilar redundancy for something this critical, I think, is the right choice,” he stated.

On November 13, Lunar Outpost revealed that it had raised a Series A round, but Cyrus stated that the business would not reveal the size due to competitive considerations. He said that the money would be used to develop the Lunar Outpost Eagle.

Citing commercial interest from potential clients, he noted that the company intends to continue working on the rover even if it is not chosen for the next stage of NASA’s LTV program. Regarding the funding, he stated, “This allows us to accelerate those plans pretty drastically,” “So, no matter what we’re going to be flying this vehicle on Starship.”

Science

Researchers Achieve Breakthrough in Quantum Simulation of Electron Transfer

Published

on

A team at Rice University has achieved a significant breakthrough in simulating molecular electron transfer using a trapped-ion quantum simulator. Their research offers fresh insights into the dynamics of electron transfer and could pave the way for innovations in molecular electronics, renewable energy, and cc.

Electron transfer is a critical process underpinning numerous physical, chemical, and biological phenomena. However, the complexity of quantum interactions has long made it a challenging area to study. Conventional computational techniques often struggle to capture the full range of variables influencing electron transfer.

To address these challenges, the researchers developed a programmable quantum system capable of independently controlling key factors such as donor-acceptor energy gaps, electronic and vibronic couplings, and environmental dissipation. Using ions trapped in an ultra-high vacuum and manipulated by laser light, the team demonstrated real-time spin dynamics and measured electron transfer rates.

“This is the first time that this kind of model has been simulated on a physical device while incorporating the role of the environment and tailoring it in a controlled way,” said Guido Pagano, lead author of the study published in Science Advances.

Pagano added, “It represents a significant leap forward in our ability to use quantum simulators to investigate models and regimes relevant to chemistry and biology. By harnessing the power of quantum simulation, we hope to explore scenarios currently inaccessible to classical computational methods.”

Through precise engineering of tunable dissipation and programmable quantum systems, the researchers explored both adiabatic and nonadiabatic regimes of electron transfer. The experiment not only illuminated how quantum effects function under diverse conditions but also identified optimal parameters for electron transfer.

The team emphasized that their findings bridge a critical gap between theoretical predictions and experimental verification. By offering a tunable framework to investigate quantum processes in complex systems, their work could lead to groundbreaking advancements in renewable energy technologies, molecular electronics, and the development of novel materials.

“This experiment is a promising first step toward understanding how quantum effects influence energy transport, particularly in biological systems like photosynthetic complexes,” said Jose N. Onuchic, study co-author. “The insights gained could inspire the design of more efficient light-harvesting materials.”

Continue Reading

Science

Crew Dragon Mission Delay Extends Astronauts’ Stay on ISS by a Month

Published

on

The next mission of SpaceX’s Crew Dragon to the International Space Station (ISS) has been postponed by a month due to delays in completing a new spacecraft. This decision will extend the stay of some astronauts aboard the ISS, including two who have been there since June.

NASA announced on December 17 that the Crew-10 mission, initially scheduled for February, is now set to launch no earlier than late March. The delay stems from the need for additional time to finish the fabrication, assembly, testing, and integration of a new Crew Dragon capsule.

Crafting the New Dragon Capsule

“Fabrication, assembly, testing, and final integration of a new spacecraft is a painstaking endeavor that requires great attention to detail,” said Steve Stich, NASA’s Commercial Crew Program Manager. He commended SpaceX’s efforts to expand the Dragon fleet and the flexibility of the ISS crew in accommodating the delay.

The new Crew Dragon will be the fifth in SpaceX’s lineup of crewed spacecraft, complementing its three cargo Dragon vehicles. According to Sarah Walker, SpaceX’s Dragon Mission Management Director, the spacecraft was near completion as of July and was undergoing final work at SpaceX’s California facility. It is now expected to arrive in Florida for final preparations in January.

While NASA did not specify the exact reasons for the delay, it considered other options, including using an existing Crew Dragon or making adjustments to the launch manifest, before opting for the delay. Existing capsules, including Freedom, currently at the ISS, and Endeavour and Resilience, which recently returned from other missions, were not available for a February launch.

Crew Adjustments and Extended ISS Stay

The Crew-10 mission will proceed with its planned roster: Anne McClain and Nichole Ayers from NASA, Takuya Onishi from JAXA, and Kirill Peskov from Roscosmos.

The delay has implications for the Crew-9 mission, launched in late September with NASA astronaut Nick Hague and Roscosmos cosmonaut Aleksandr Gorbunov. They were joined by NASA astronauts Suni Williams and Butch Wilmore, who have been on the station since June after arriving on Boeing’s CST-100 Starliner.

Originally, Williams and Wilmore were scheduled to stay for just over a week, but their time on the ISS will now extend to about 10 months. NASA had earlier decided to return the uncrewed Starliner to Earth due to concerns with its thrusters.

Despite the delay, NASA emphasizes that Williams and Wilmore are not “stranded” as they can return to Earth in an emergency. Their extended stay is tied to the decision to use the new Crew Dragon for the upcoming mission, as preparing another vehicle was deemed impractical.

Looking Ahead

Assuming the Crew-10 launch proceeds in late March, the Crew-9 spacecraft is expected to return to Earth in early April after a handover period. This delay underscores the complexity of preparing new spacecraft while ensuring the safety and readiness of all missions.

As the new Crew Dragon nears completion, SpaceX and NASA remain focused on maintaining seamless operations aboard the ISS and advancing human space exploration.

Continue Reading

Science

Boeing Starliner crews will have an extended stay on the ISS due to SpaceX’s delay

Published

on

NASA said on Tuesday that it has decided to postpone the launch until at least late March because SpaceX’s upcoming crew rotation mission to the ISS would utilize a new Dragon spacecraft that won’t be ready by the initial February launch date.

For the two NASA astronauts who traveled to the ISS last June on Boeing’s troubled Starliner spacecraft, that means an even longer stay. On June 5, they took off from Cape Canaveral, Florida, aboard a United Launch Alliance Atlas V on the first crewed mission of Starliner. They arrived at the ISS one day later for a stay that was only expected to last eight days.

NASA decided to be cautious and maintain Butch Wilmore and Suni Williams aboard the ISS while sending Starliner home without a crew due to issues with the spacecraft’s thrusters and helium leaks on its propulsion module.

In order for Williams and Wilmore to have a trip home, they will now be traveling on the SpaceX Crew Dragon Freedom, which traveled up to the ISS and docked in September, although with only two crew members on board rather than the customary four.

When Crew-10 arrived in late February, the mission’s goal was to take a trip home.

However, NASA confirmed that Crew-10 will not fly with its replacement crew until late March. This allows NASA and SpaceX time to prepare the new Dragon spacecraft, which has not yet been given a name, for the voyage. Early January is when it is anticipated to reach Florida.

“Fabrication, assembly, testing, and final integration of a new spacecraft is a painstaking endeavor that requires great attention to detail,” stated Steve Stich, the program manager for NASA’s Commercial Crew. “We appreciate the hard work by the SpaceX team to expand the Dragon fleet in support of our missions and the flexibility of the station program and expedition crews as we work together to complete the new capsule’s readiness for flight.”

It would be the fifth Dragon spacecraft with a crew. Its fleet of four current Dragon spacecraft has flown 15 times, sending 56 passengers to space, including two who were two-time fliers. The first crewed trip took place in May 2020. Each spacecraft’s name is chosen by the crew on its first flight.

According to NASA, teams considered using the other crew Dragon spacecraft that were available but decided that rescheduling Crew-10’s launch date was the best course of action.

JAXA (Japan Aerospace Exploration Agency) astronaut and mission specialist Takuya Onishi will undertake his second spaceflight, Roscosmos cosmonaut and mission specialist Kirill Peskov will make his first spaceflight, NASA astronaut and commander Anne McClain will make her second spaceflight, and NASA astronaut and pilot Nichole Ayers will become the first member of the 2021 astronaut candidate class to reach space.

Given that Crew-9 won’t be able to return home until a handover period following Crew-10’s arrival, Wilmore and Williams may have to spend nearly nine months aboard as a result of the delay.

Rotations aboard the ISS typically last six months.

It is unclear when and how Starliner will receive its final certification so that it can start trading off the regular ferry service with SpaceX, as NASA’s Commercial Crew Program aims to have two providers for U.S.-based rotation missions with SpaceX and Boeing. This is due to the Crew Flight Test mission’s incomplete launch.

According to the terms of its contract, Boeing must deliver six missions to the ISS before the space station’s service ends, which is presently scheduled for 2030.

Continue Reading

Trending

error: Content is protected !!